A water utility in a mid-sized city installs 40,000 smart meters over eighteen months. Within a year, three separate vendor platforms cannot exchange pressure data with the SCADA system that runs the pumping stations, and the utility’s IT team discovers that half the meter firmware has no patching path at all. This is not a…